T.LAM’s Exploration Drilling at Amphitheatre Intercepts High-Grade Uranium; Points to a Developing Satellite Deposit

Drilling at Amphitheatre Prospect returns high-grade uranium intercepts in AMD009 Mineralization at Amphitheatre shows a relationship with mafic intrusive units sharing potential genetic similarities with the nearby Westmoreland uranium deposit Significant intersection within AMD009: Broad zone of 11.3m @ 0.23% U3O8 Including 4.0m @ 0.52% U3O8 from 38.0m Also including within 1.0m @1.00% U3O8 from 40.0m AMD009 is the first hole to have successfully intersected an apparent …

T.FCU Completes Front End Engineering Design; Commences Detailed Engineering at PLS

FISSION URANIUM CORP. (” Fission ” or ” the Company “) is pleased to announce it has completed the Front End Engineering Design (“FEED”) at its PLS high-grade uranium project in Saskatchewan, Canada . The completion of this crucial development phase includes all geotechnical drilling required for the tailings management facility (“TMF”) and underground mine access, including the decline and ventilation shafts. …

T.FCU Announces Postponement of Special Meeting of Securityholders

FISSION URANIUM CORP. (TSX: FCU) (OTCQX: FCUUF) (“Fission“) announces the postponement of the special meeting (the “Meeting“) of Fission’s shareholders and optionholders (collectively, “Securityholders“) in connection with the previously announced plan of arrangement (the “Arrangement“) with Paladin Energy Limited (“Paladin“). The Meeting will reconvene on September 9, 2024 at 10:00 a.m. (Pacific time). Based on a preliminary assessment of votes …

V.SYH Partner Azincourt Receives Results of 2024 Winter Drilling Program at the East Preston Uranium Project

Skyharbour Resources Ltd.’s (TSX-V:SYH) (OTCQX:SYHBF) (Frankfurt:SC1P) (the “Company”) partner company Azincourt Energy (“Azincourt”), is pleased to announce that the sample analysis have been received from the 2024 exploration program at the East Preston uranium project in the Athabasca Basin, Saskatchewan, Canada. The 2024 drill program consisted of 1,086 metres of drilling in four diamond drill holes completed earlier this …

T.FCU Regional Exploration Drilling at Saloon East Hits Strongest Radioactivity to Date Outside of the Triple R Deposit

90% of holes on Saloon Shear Zone intersect anomalous radioactivity FISSION URANIUM CORP. (” Fission ” or ” the Company “) is pleased to announce completion of the summer 2024 regional exploration drill program at its PLS high-grade uranium project, in the Athabasca Basin region of Saskatchewan, Canada . A total of fifteen holes (~6,428m) were completed with fourteen holes targeting the Saloon Shear …

U.UEC Intersects 12.7% eU3O8 over 7.2 metres, 850 m northeast of Roughrider Deposit

Uranium Energy Corp (NYSE American: UEC, the “Company” or “UEC”) is pleased to report drill results from its Roughrider Project located in Northern Saskatchewan, Canada. Drilling 850 m northeast of the Roughrider Deposit has intersected the best hole to date outside of the resource area on a parallel trend to Roughrider. Exploration Drilling: UEC’s ongoing drill program …

T.GLO Announces Niger Government Support for the Dasa Project

Global Atomic Corporation (“Global Atomic” or the “Company”), (TSX: GLO, OTCQX: GLATF, FRANKFURT: G12) is pleased to announce that a letter was issued by the Government of the Republic of Niger on August 15, 2024, in which President Tiani and the Council of Ministers confirmed their support for Global Atomic and the Dasa Project. In the …

T.LAM Australian drilling proceeding as planned; Strong downhole gamma radioactivity confirms mineralisation at initial three targets

Second drill rig has completed RC drilling at Long Pocket All 38 planned RC drillholes completed (for 2,139 meters) at the Long Pocket prospect and on track for maiden Mineral Resource Estimation expected by Q1 2025 Composite downhole gamma responses over 1m of up to 13,993 counts per second (“cps”) (including 27,319 cps[1]) confirm shallow …

U.UEC Announces Restart of ISR Uranium Production in Wyoming

Uranium Energy Corp (NYSE American: UEC) (the “Company” or “UEC”) is pleased to announce the successful startup of uranium production at its past-producing Christensen Ranch In-Situ Recovery (“ISR”) operations in Wyoming. Production commenced in the previously operated Mine Unit 10 at Christensen Ranch on August 6th.  To date, uranium concentrations in the initial production patterns are meeting expectations and …

T.GLO Announces Q2 2024 Results

Dasa Uranium Project Remains on Schedule to Produce Yellowcake in Q1 2026 Global Atomic Corporation (“Global Atomic” or the “Company”), (TSX: GLO, OTCQX: GLATF, FRANKFURT: G12) announced today its operating and financial results for the quarter ended June 30, 2024.  For more detail, please refer to the Condensed Interim Consolidated Financial Statements and Management’s Discussion and …