Uranium Tipping Point: The Pending Price Correction 

Uranium market shift is underway with recent price correction representing the first indication that we are reaching  the tipping point. View a 3-minute video here. About Purepoint Purepoint Uranium Group Inc. is focused on the precision exploration of its nine projects in the Canadian Athabasca Basin, the world’s richest uranium region. Established in the Athabasca Basin …

Uranium Week: Production Reduction

According to a report released by the US Energy Information Agency last week, US uranium production in 2019 totalled 170,000lbs U3O8, down -76% on 2018. Total shipments of uranium concentrate from US producers were 190,000lbs in 2019, -87% less than in 2018. The EIA noted that total employment in the US uranium production industry was …

Friday Night Musings: Uranium Location Spreads, Seasonality and What We’re Watching Now

In the uranium market, there are three large western converters where most trading and physical delivery of material take place:  Cameco’s Port Hope (“CMC”) in Canada, ConverDyn’s Metropolis (“CVD”) in the United States and Orano’s Comurhex (“CHX”) in France.  Historically, uranium for delivery at each location was priced relatively tightly (say $0.10 – $0.50) with …

Slow, Steady Progress for Two U.S. Nuclear Power Projects

Plant Vogtle in Georgia installs more Westinghouse reactors while Oregon-based NuScale awaits final approval of its small modular reactor design   There are 53 nuclear reactors currently under construction around the world. Only two are in the United States, once the world’s leader in nuclear energy development. And those two reactors represent expansions of a preexisting …

Construction of Abu Dhabi nuclear plant on track despite coronavirus

Work on Units 2-4 was briefly halted after pandemic but have now resumed said FANR. Abu Dhabi: Construction at the Barakah Nuclear Plant continues to remain on track according to the Federal Authority for Nuclear Regulation (FANR), with the COVID-19 pandemic causing no major disruptions to the site. “The construction of Units 2-4 were halted …