UEX Corporation (UEX:TSX) (“UEX” or the “Company”) is pleased to announce that summer drilling is underway at the Christie Lake Project.
The summer program consists of a two-phase exploration drilling program with a combined budget of up to $2.5 million with the sole goal of expanding the high-grade Ōrora Deposit discovered during the winter 2017 exploration campaign. Highlights from the winter discovery program includes hole CB-109, which intersected 22.81% U3O8 over 8.6 m from 475.1 to 483.7 m, and hole CB-116A, which returned 20.00% U3O8 over 8.5 m from 471.0 to 479.5 m. True widths are estimated to be between 80-85% of core length.
The Ōrora Deposit has so far been defined over a minimum strike length of 65 m and has a width of at least 20 m at its southwestern end. The deposit consists of a very high-grade core which is flanked by additional mineralization at the unconformity. The ultimate width of the Ōrora Deposit at the unconformity has not yet been defined by drilling. Most importantly, Ōrora remains open for expansion along strike to the southwest and to the northeast and down-dip to the southeast into the basement.
Phase I of the summer program has a budget of $1.5 million and will consist of nine drill holes totaling approximately 4,500 m. The majority of Phase I holes will test the area along strike to the southwest of the Ōrora Deposit. Phase II will be dependent upon the results of Phase I, has a budget of $1.0 million, and would consist of an additional nine drill holes totaling another 4,500 m.
For a location of the existing mineralized intersections at the Ōrora Deposit, please refer to Figure 1.
About the Christie Lake Project
UEX currently holds a 30% interest in the Christie Lake Project and is working under an option agreement to earn up to a 70% interest. The Project is located approximately 9 km northeast and along strike of Cameco’s McArthur River Mine, the world’s largest uranium producer. The P2 Fault, the controlling structure for all of the McArthur River deposits, continues to the northeast beyond the mine. UEX believes that through a series of en-echelon steps the northeast strike extension of the P2 Fault not only crosses the Project but also controls the three known uranium deposits on Christie Lake, the Ōrora, Paul Bay and Ken Pen Deposits.
The Paul Bay and Ken Pen Deposits are estimated to host a combined 20.87 million pounds of U3O8 at an average grade of 3.22% U3O8 and were discovered in 1989 and 1993 respectively. This is a historic resource estimation which does not use resource classifications consistent with NI 43-101. The historical resource estimate was presented in an internal report titled Christie Lake Project, Geological Resource Estimate completed by PNC Tono Geoscience Center, Resource Analysis Group, dated September 12, 1997. The historical resource was calculated using a 3 D block model using block sizes of 2 m by 2 m by 2 m, and block grades interpolated using the inverse distance squared method over a circular search radius of 25 m and 1 m height. Specific gravities for each deposit were averaged from specific gravity measures of individual samples collected for assay. UEX plans to complete additional infill drilling on the deposits during the option earn-in period to upgrade these historic resources to indicated and inferred. A qualified person has not done sufficient work to classify the historic estimate as current mineral resources or mineral reserves. UEX is not treating the historic estimate as current mineral reserves or mineral resources and the reader is advised not to rely upon this historical estimate as a resource estimate.
Qualified Persons and Data Acquisition
Technical information in this news release has been reviewed and approved by Roger Lemaitre, P.Eng., P.Geo., UEX’s President and CEO and Trevor Perkins, P.Geo., UEX’s Exploration Manager, who are each considered to be a Qualified Person as defined by National Instrument 43-101.
About UEX
UEX (TSX:UEX, OTC:UEXCF.PK, UXO.F) is a Canadian uranium exploration and development company involved in fourteen uranium projects, including three that are 100% owned and operated by UEX, one joint venture with AREVA Resources Canada Inc. (“AREVA”) that is operated by UEX, as well as eight joint ventures with AREVA, one joint venture with AREVA and JCU (Canada) Exploration Company Limited, which are operated by AREVA, and one project (Christie Lake) under option from JCU (Canada) Exploration Company Limited and operated by UEX. The fourteen projects are located in the eastern, western and northern perimeters of the Athabasca Basin, the world’s richest uranium belt, which in 2015 accounted for approximately 22% of the global primary uranium production. UEX is currently advancing several uranium deposits in the Athabasca Basin which include the Christie Lake deposits, the Kianna, Anne, Colette and 58B deposits at its currently 49.1%-owned Shea Creek Project (located 50 km north of Fission’s Triple R Deposit and Patterson Lake South Project, and NexGen’s Arrow Deposit) the Horseshoe and Raven deposits located on its 100%-owned Horseshoe-Raven Development Project and the West Bear Deposit located at its 100%-owned Hidden Bay Project.
About JCU
JCU is a private company that is actively engaged in the exploration and development in Canada. JCU is owned by three Japanese companies. Amongst these, Overseas Uranium Resources Development Co., Ltd. (“OURD”) acts as the manager of JCU. JCU has partnerships with UEX, AREVA, Cameco, Denison and others on uranium exploration and development projects in the Athabasca Basin of Northern Saskatchewan including Millennium and Wheeler River and the Kiggavik project in the Thelon Basin in Nunavut.
Source: Christie Lake Summer Program Underw… | UEX Corporation