President Trump takes no action at this time to adjust uranium imports to the US. Establishes US Nuclear Fuel Working Group

Ur-Energy Inc. has learned that President Donald Trump issued a memorandum on July 12, 2019, in response to the uranium Section 232 investigation completed by the Department of Commerce. (See also Ur-Energy News Release July 13, 2019) The President’s Memorandum states that the Secretary of Commerce found that “…uranium is being imported in such quantities …

T.NXE continues to intersect high-grade mineralization in all A2 and A3 targets

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to report radioactivity results for an additional forty holes comprising 18,166.5 m from the Company’s Feasibility stage drilling program at our 100% owned, Rook I property in the Athabasca Basin, Saskatchewan. Conversion of Indicated to Measured This current phase of the 2019 …

V.FUU Begins Hunt for Source of the High-Grade Uranium Boulder Train at Hearty Bay

FISSION 3.0 CORP. (“Fission 3” or “the Company”) is pleased to announce work programs for its Hearty Bay and Wales Lake projects in the Athabasca Basin region of Saskatchewan, Canada. Both projects are prospective for hosting high-grade uranium and the work programs will be used to identify high-priority areas for drill testing. At Hearty Bay, experts …

V.SYH Announces UAV-MAGTM Airborne Geophysics Surveying on its High Grade Moore Uranium Project

Skyharbour Resources Ltd. (TSX-V: SYH) (OTCQB: SYHBF) (Frankfurt: SC1P) (the “Company”) is pleased to announce the commencement of an Unmanned Aerial Vehicle Magnetometer Survey (“UAV-MAGTM Survey”) to be completed by Pioneer Aerial Surveys Ltd. (“Pioneer”) on the Company’s 35,705 hectare Moore Uranium Project, located approx. 15 km east of Denison Mine’s Wheeler River project on the southeast …

V.FUU hits alteration, faulting at Cree Bay; Plans follow-up drilling

FISSION 3.0 CORP. (“Fission 3” or “the Company”) is pleased to announce that the first pass drill program at its Cree Bay property in the Athabasca Basin region of Saskatchewan, Canada, has encountered significant faulting, strong hydrothermal alteration and elevated concentrations of pathfinder elements in both holes. Pathfinder elements (such as uranium and boron), can …

T.DML announces initiation of ISR field testing as the summer field program commences at Wheeler River

Denison Mines Corp. (“Denison” or the “Company”) (DML: TSX, DNN: NYSE American) is pleased to announce the commencement of In-Situ Recovery (“ISR”) field testing, as part of an active summer 2019 field program planned for the Company’s 90% owned Wheeler River Uranium Project (“Wheeler River”) in northern Saskatchewan, Canada. Key components of the field program include: …

V.PTU: Work Resumes at Smart Lake

Purepoint Uranium Group Inc. (the “Company” or “Purepoint”) (TSXV: PTU) announced today that it is preparing to commence an initial program at the Smart Lake JV, a project owned jointly by Cameco Corp. (73%) and Purepoint Uranium Group Inc. (27%).  The Smart Lake property is situated in the southwestern portion of the Athabasca Basin, approximately …

V.SYH Discovers New High Grade Uranium Mineralization at Maverick Zone including 2.31% U3O8 over 2.5m within 0.62% U3O8 over 12.0m; Summer 2019 Drill Program Upcoming

Skyharbour Resources Ltd. (TSX-V: SYH) (OTCQB: SYHBF) (Frankfurt: SC1P) (the “Company”) is pleased to announce the results from its 2019 winter/spring diamond drilling program at its 100% owned, 35,705 hectare Moore Uranium Project, approximately 15 kilometres east of Denison Mine’s Wheeler River project and proximal to regional infrastructure like Cameco’s Key Lake/McArthur River operations in the Athabasca …