NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX:NXE, NYSE MKT:NXE) is pleased to report geotechnical results for the initial shaft pilot holes and assays for all twenty-nine holes comprising 20,482.31 m, drilled during the summer development program on the Company’s 100% owned Rook I property, in the Athabasca Basin, Saskatchewan.
Highlights:
Shaft Pilot Hole Report
NexGen Energy Ltd. retained SRK Consulting Canada Inc. to complete a geotechnical, hydrogeological, and thermal characterization to confirm the selection of a suitable location for the proposed shaft and facilitate a Feasibility Study (“FS”) level technical assessment related to the shaft pilot hole program. Additionally, DGI Geoscience Inc. completed a down-hole geophysics program to collect continuous data, in electronic format, of: sonic velocity, density, normal resistivity, natural gamma, spontaneous potential, mechanical caliper, and acoustic and optical scans of the borehole walls.
Three shaft pilot holes were successfully completed to a depth between 650 m and 702 m. The vertically drilled shaft pilot holes were kept within a 6.0 m diameter cylinder from surface through to their termination depths, intersected minimal structure and showed low hydraulic conductivity throughout via packer testing at regular intervals.
The shaft pilot hole geotechnical and hydrogeological conditions compiled in the Rook I Arrow Deposit Pilot Characterization Report will facilitate FS level engineering and design of two vertical shafts at the Arrow Deposit; one for exhaust air and one for production and fresh air.
- Overburden / Sedimentary Geotechnical: The sedimentary profile was confirmed to extend from surface down to the basement unconformity at approximately 100 m. Typical of holes drilled at the Arrow Deposit, an average sedimentary profile was developed from the shaft pilot holes:
- Overburden soils and sediments extended to 14 m
- Cretaceous Manville Group silts and clays to 63 m
- Devonian sandstone to 86 m
- Athabasca Group sandstones to maximum depth of 100 m (equating to a thickness of 14 mof Athabasca Group sandstone)
- Crystalline basement rock below 100 m
- Rock Geotechnical:
- Below 200 m depth and continuing to the end of hole (701.47 m), GAR-18-015 shows good-to-very good competent rock mass and very low fracture frequency (FF/m).
- Hydrogeological:
- General decrease in hydraulic conductivity (K) with depth below the basement unconformity resulting in favorable underground development conditions;
- Groundwater chemistry is not considered to present any risk to shaft development and construction.
Geotechnical Characterization of the A2 Sub-Zone
Assays have confirmed significant uranium mineralization was intersected in the two holes drilled to geotechnically characterize the rock mass within the A2 sub-zone. The holes were designed to obtain data in order to quantify the sub-surface conditions within the mine plan. Both holes were collared at a steep inclination, then shallowed out to a dip of approximately 57°.
- GAR-18-016 intersected 32.5 m at 6.65% U3O8 (574.5 to 607.0 m) including 10.0 m at 20.04% U3O8 (583.0 to 593.0 m) additionally, 10.0 m at 1.43% U3O8 (617.5 to 627.5 m). The hole intersected significant mineralization outside of the current high-grade resource shells and are not incorporated into the current mineral resource inventory. In terms of packers testing within the A2 sub-zone, GAR-18-016 showed low flow rates averaging 1.656 L/min (576.5 m to 639.0 m).
- GAR-18-017 intersected 7.5 m at 3.03% U3O8 (616.5 to 624.0 m) including 3.5 m at 6.34% U3O8(620.0 to 623.5 m). The hole was drilled in an open area within the A2 sub-zone between two previously unconnected shells which has not yet been incorporated into the current mineral resource inventory. In terms of packers testing within the A2 sub-zone, GAR-18-017 showed low flow rates averaging 0.950 L/min (567.0 m to 618.0 m) and 0.218 L/min (618.0 m to 669.0 m)
Expansion, A2 High-Grade Domain
Assays from drilling focused on an under-explored area to the northeast boundary of the currently defined A2 high-grade domain have confirmed the presence of significant uranium mineralization within the A2 shear zone as well as between the A2 and A3 shears. The hole demonstrates the continuity of high-grade mineralization beyond the currently defined A2 high-grade domains.
- AR-18-220c1 located, approximately 50 m along strike to the northeast of AR-14-30 (10.32% U3O8 over 46.0 m) intersected 36.0 m at 1.12% U3O8 (512.0 to 548.0 m) including 2.0 mat 10.0% U3O8 (528.5 to 530.5 m) additionally, 16.5 m at 1.43% U3O8 (578.0 to 594.5 m). Between the currently defined A2 and A3 resource shells the hole intersected 36.0 m at 0.64% U3O8 (396.0 to 432.0 m) including 4.0 m at 5.23% U3O8 (402.05 to 406.5 m).
Drill hole locations and schematics are shown in Figures 1 to 5, while assay results are displayed in Table 1.
Leigh Curyer, Chief Executive Officer, commented: “These results highlight the strength of the technical setting of the Arrow Deposit for development and the growth potential that remains at Arrow. Five years ago today, NexGen discovered the Arrow Deposit. With over 300,000m of drilling since that date and Arrow continuing to show incredible growth with these results, it is truly unique.”
James Hatley, Senior Vice-President, Project Development, commented: “The geotechnical and hydrological conditions for shaft sinking at the Rook I Project have been thoroughly investigated at the feasibility level by SRK, and the bulk hydraulic conductivity in the basement rock from my experience is excellent.”
Troy Boisjoli, Vice-President, Operations and Project Development, commented: “The assay results from the Summer 2018 drill program have confirmed areas with future growth potential at the Arrow Deposit. Another aspect confirmed by these assay results was the strong geotechnical characteristics of the A2 sub-zone. Both of these objectives were successfully reached, supporting the planning for the 2019 drill program which commenced in December 2018. We look forward to continuing this systematic approach in advancing the Arrow Deposit towards the completion of the Feasibility Study, scheduled for H1/2020.
Development, Activities & Financial
- Expediting Arrow to Feasibility by initiation of a 2-stage 125,000m (10 rig) high density drilling program that commenced in mid-December 2018 to focus on mine optimization plans based on Measured and Indicated mineral resources.
- As of January 31, 2019, the Company had cash-on-hand of approximately $110 million which fully funds NexGen for all drilling, feasibility and development programs planned this year.
Table 1: Arrow Drill Hole Data
Drill Hole |
Athabasca Group – Basement Unconformity Depth (m) |
SRC Geoanalytical Results |
||||||
Hole ID |
Azimuth |
Dip |
Total Depth (m) |
From (m) |
To (m) |
Interval (m) |
U3O8 (wt%) |
|
AR-18-210c1 |
327 |
-70 |
876.5 |
115 |
606.5 |
607.0 |
0.5 |
0.04 |
AR-18-210c2 |
327 |
-70 |
957.5 |
N/A |
No significant intersections |
|||
AR-18-210c3 |
327 |
-70 |
946 |
N/A |
No significant intersections |
|||
AR-18-211c1 |
327 |
-70 |
1128.5 |
N/A |
865.5 |
866 |
0.5 |
0.05 |
869 |
871 |
2 |
0.02 |
|||||
875 |
877 |
2 |
0.03 |
|||||
960.5 |
962.5 |
2 |
0.03 |
|||||
988 |
991 |
3 |
0.02 |
|||||
1088.5 |
1089.5 |
1 |
0.04 |
|||||
AR-18-211c2 |
327 |
-70 |
1014.5 |
N/A |
No significant intersections |
|||
AR-18-211c3 |
327 |
-70 |
1063.5 |
N/A |
647 |
647.5 |
0.5 |
0.01 |
865.5 |
866.5 |
1 |
0.02 |
|||||
953.5 |
954.5 |
1 |
0.03 |
|||||
AR-18-212c1 |
325 |
-67 |
807.5 |
97.7 |
No significant intersections |
|||
AR-18-213c1 |
327 |
-65 |
765.5 |
98.85 |
No significant intersections |
|||
AR-18-214c1 |
327 |
-65 |
891.5 |
111 |
149.5 |
151 |
1.5 |
0.01 |
157 |
161.5 |
4.5 |
0.13 |
|||||
337 |
337.5 |
0.5 |
0.05 |
|||||
AR-18-215c1 |
327 |
-70 |
990.5 |
N/A |
883.5 |
884 |
0.5 |
0.02 |
906 |
906.5 |
0.5 |
0.02 |
|||||
AR-18-216c1 |
327 |
-65 |
483.5 |
107.4 |
No significant intersections |
|||
AR-18-217c1 |
327 |
-73.5 |
1233.5 |
122.5 |
196 |
202 |
6 |
0.02 |
727.5 |
728 |
0.5 |
0.02 |
|||||
964.5 |
966 |
1.5 |
0.35 |
|||||
969.5 |
971 |
1.5 |
0.04 |
|||||
977.5 |
978.5 |
1 |
0.10 |
|||||
AR-18-218c1 |
327 |
-65 |
827 |
97.8 |
No significant intersections |
|||
AR-18-219c1 |
327 |
-65 |
663.5 |
133.95 |
342.5 |
347 |
4.5 |
0.05 |
353 |
354 |
1 |
0.15 |
|||||
358 |
371 |
13 |
0.08 |
|||||
375 |
375.5 |
0.5 |
0.03 |
|||||
381.5 |
383 |
1.5 |
0.02 |
|||||
387 |
416 |
29 |
0.08 |
|||||
420 |
421.5 |
1.5 |
0.01 |
|||||
424.5 |
435 |
10.5 |
0.05 |
|||||
438 |
472 |
34 |
0.14 |
|||||
572 |
579.5 |
7.5 |
0.07 |
|||||
586.5 |
590 |
3.5 |
1.87 |
|||||
incl. |
587 |
588 |
1 |
5.73 |
||||
593 |
595.5 |
2.5 |
0.02 |
|||||
600.5 |
605 |
4.5 |
0.17 |
|||||
610 |
612 |
2 |
0.43 |
|||||
621 |
625.5 |
4.5 |
0.32 |
|||||
631 |
631.5 |
0.5 |
0.21 |
|||||
AR-18-220c1 |
327 |
-68 |
744.5 |
130.35 |
331 |
332 |
1 |
0.02 |
335.5 |
337.5 |
2 |
0.04 |
|||||
359.5 |
362 |
2.5 |
0.03 |
|||||
365 |
380.5 |
15.5 |
0.12 |
|||||
383.5 |
391.5 |
8 |
0.18 |
|||||
396 |
432 |
36 |
0.64 |
|||||
incl. |
402.5 |
406.5 |
4 |
5.23 |
||||
435.5 |
441 |
5.5 |
0.08 |
|||||
444.5 |
456 |
11.5 |
0.05 |
|||||
475 |
491 |
16 |
0.03 |
|||||
501 |
508.5 |
7.5 |
0.11 |
|||||
512 |
548 |
36 |
1.12 |
|||||
incl. |
520.5 |
521.5 |
1 |
8.55 |
||||
incl. |
528.5 |
530.5 |
2 |
10.06 |
||||
578 |
594.5 |
16.5 |
1.43 |
|||||
incl. |
588.5 |
592.5 |
4 |
5.68 |
||||
597 |
599 |
2 |
0.05 |
|||||
624.5 |
625.5 |
1 |
0.10 |
|||||
641.5 |
646.5 |
5 |
0.05 |
|||||
657 |
660.5 |
3.5 |
0.02 |
|||||
680 |
682.5 |
2.5 |
0.04 |
|||||
AR-18-220c1a |
327 |
-68 |
441 |
448 |
445 |
446.5 |
1.5 |
0.06 |
GAR-18-006 |
147 |
-80 |
737.4 |
100.8 |
518 |
522 |
4 |
0.21 |
576 |
578 |
2 |
0.55 |
|||||
600 |
601 |
1 |
0.03 |
|||||
GAR-18-006a |
147 |
-80 |
155.4 |
101 |
No significant intersections |
|||
GAR-18-007 |
147 |
-68 |
671.4 |
93 |
No significant intersections |
|||
GAR-18-008 |
147 |
-65 |
629.6 |
96.05 |
597 |
598.5 |
1.5 |
0.10 |
617.5 |
618 |
0.5 |
0.18 |
|||||
GAR-18-009 |
147 |
-70 |
641.4 |
101 |
No significant intersections |
|||
GAR-18-010 |
147 |
-90 |
650.44 |
98 |
548 |
551 |
3 |
0.06 |
553.5 |
555 |
1.5 |
0.12 |
|||||
558 |
559 |
1 |
0.01 |
|||||
GAR-18-011 |
147 |
-65 |
799.5 |
95.05 |
No significant intersections |
|||
GAR-18-012 |
327 |
-75 |
1043.4 |
N/A |
564.5 |
566 |
1.5 |
0.05 |
589 |
589.5 |
0.5 |
0.02 |
|||||
602.5 |
606 |
3.5 |
0.28 |
|||||
766 |
767.5 |
1.5 |
0.02 |
|||||
GAR-18-013 |
147 |
-90 |
650.4 |
108.9 |
No significant intersections |
|||
GAR-18-014 |
327 |
-80 |
659.4 |
101 |
No significant intersections |
|||
GAR-18-015 |
147 |
-90 |
701.47 |
96.35 |
No significant intersections |
|||
GAR-18-016 |
327 |
-65 |
660 |
128.85 |
492 |
493 |
1 |
0.09 |
534 |
539.5 |
5.5 |
0.04 |
|||||
550 |
554.5 |
4.5 |
0.04 |
|||||
574.5 |
607 |
32.5 |
6.65 |
|||||
incl. |
583 |
593 |
10 |
20.04 |
||||
incl. |
605 |
607 |
2 |
4.43 |
||||
617.5 |
627.5 |
10 |
1.43 |
|||||
incl. |
622.5 |
626 |
3.5 |
3.19 |
||||
GAR-18-017 |
327 |
-65 |
717 |
127.75 |
503 |
504 |
1 |
0.11 |
514.5 |
515 |
0.5 |
2.03 |
|||||
517.5 |
518 |
0.5 |
0.36 |
|||||
521.5 |
522 |
0.5 |
0.04 |
|||||
530 |
532.5 |
2.5 |
1.35 |
|||||
535.5 |
537 |
1.5 |
0.11 |
|||||
563.5 |
567 |
3.5 |
0.06 |
|||||
577.5 |
578.5 |
1 |
0.17 |
|||||
581 |
599 |
18 |
0.06 |
|||||
616.5 |
624 |
7.5 |
3.03 |
|||||
incl. |
620 |
623.5 |
3.5 |
6.34 |
||||
627 |
631 |
4 |
0.12 |
|||||
638.5 |
640 |
1.5 |
0.02 |
|||||
650.5 |
661 |
10.5 |
0.04 |
|||||
666 |
669 |
3 |
0.07 |
* Scroll to the right to see the table data.
Parameters:
- Maximum internal dilution 2.0 m downhole
- Minimum thickness of 0.5 m downhole
- Cutoff grade 0.01% U3O8
- All depths and intervals are metres downhole, true thicknesses are yet to be determined. Resource modelling in conjunction with an updated mineral resource estimate is required before true thicknesses can be determined.
- Directional drilling has often resulted in mineralization intersected at a more favourable and shallower dip
About NexGen
NexGen is a British Columbia corporation with a focus on the acquisition, exploration and development of Canadian uranium projects. NexGen has a highly experienced team of uranium industry professionals with a successful track record in the discovery of uranium deposits and in developing projects through discovery to production. NexGen owns a portfolio of prospective uranium exploration assets in the Athabasca Basin, Saskatchewan, Canada, including a 100% interest in Rook I, location of the Arrow Deposit in February 2014, the Bow discovery in March 2015, the Harpoon discovery in August 2016 and the Arrow South discovery in July 2017. NexGen is the recipient of the PDAC’s 2018 Bill Dennis Award and the 2019 Environmental and Social Responsibility Award.
Technical Disclosure
The technical information in this news release with respect to the PFS has been reviewed and approved by Paul O’Hara, P.Eng. of Wood., David Robson, P.Eng., M.B.A., and Jason Cox, P.Eng. of RPA, each of whom is a “qualified person” under National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI-43-101“).
The Mineral Resource Estimate was completed by Mr. Mark Mathisen, C.P.G., Senior Geologist at RPA and Mr. David Ross, P.Geo., Director of Resource Estimation and Principal Geologist at RPA. Both are independent Qualified Persons in accordance with the requirements of National Instrument (NI) 43-101 and they have approved the disclosure herein. All other technical information in this news release has been approved by Mr. Troy Boisjoli, Geoscientist Licensee, Vice President – Operations & Project Development for NexGen. Mr. Boisjoli is a qualified person for the purposes of NI 43-101 and has verified the sampling, analytical, and test data underlying the information or opinions contained herein by reviewing original data certificates and monitoring all of the data collection protocols. All other technical information in this news release has been approved by Mr. James Hatley, a Professional Engineer, Senior Vice-President – Project Development for NexGen. Mr. Hatley is a qualified person for the purposes of NI 43-101 and has reviewed the underlying the information or opinions contained herein on mine design.
A technical report in respect to the PFS is filed on SEDAR (www.sedar.com) and EDGAR (www.sec.gov/edgar.shtml) and is available for review on NexGen Energy’s website (www.nexgenenergy.ca).
Source: NexGen Energy Ltd.