VANCOUVER, May 2, 2018 /CNW/ – NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX:NXE, NYSE MKT:NXE) is pleased to report radioactivity results for fifty-four holes comprising 30,208 m from Arrow, South Arrow and regional exploration as part of our now concluded winter drilling program on our 100% owned, Rook I property, in the Athabasca Basin, Saskatchewan.
Highlights:
Discovery of A0 Shear
Follow up drilling to the northwest of the Arrow deposit (where hole GAR-17-001 recently discovered mineralization that returned 8.0 m at 1.43% U3O8) has successfully confirmed mineralization in a new shear named the “A0 Shear”.
- AR-18-187c3 intersected 33.0 m of total composite mineralization including 0.3 m of total composite off-scale radioactivity (>10,000 to 17,000 cps) within a 67.5 m section (535.5 to 603.0 m) in the A0 shear.
New Mineralization Intersected 160 m Northwest of the AO Shear
Furthermore, the last hole of the 2018 winter program intersected off-scale mineralization 160 mnorthwest of the A0 shear. This new area of mineralization has yet to be defined, meaning the northwest remains completely open and untested for the future expansion of the Arrow Deposit.
- AR-18-208c1 intersected 10.5 m of total composite mineralization including 0.2 m of total composite off-scale radioactivity (>10,000 to 32,800 cps) within a 182.5 m section (562.0 to 744.5 m) northwest of the A0 shear zone.
Mineralization Intersected to the Northeast of the A1 and A2 Shears
Drilling focused to the northeast of the Arrow Deposit, testing 50 m along strike from known mineralization at varying elevations intersected significant mineralization within the A1 and A2 shears. The systematic step-outs to the northeast show that Arrow remains largely open and untested at these elevations in the A1 and A2 shears.
- AR-18-189c4 intersected 40.0 m of total composite mineralization including 3.9 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within a 54.0 m section (820.0 to 874.0 m) in the A1 and A2 shears. The hole successfully expanded both the A1 and A2 shear zones to the northeast of existing A1 and A2 inferred resource grade shells.
A2 Shear Expansion
- AR-18-186c1 intersected 28.5 m of total composite mineralization including 5.3 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within a 45.0 m section (507.5 to 552.5 m) in the A2 shear. The hole successfully expanded the thickness of the A2 shear zone to the northeast of the current A2 Inferred resource grade shells.
- AR-18-200c2 intersected 36.0 m of total composite mineralization including 5.1 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within a 43.0 m section (739 to 782.0 m) in the A2 shear. The hole expanded the thickness of the A2 shear zone, down-dip from the existing A2 high-grade domain.
A3 Shear Infill
Positive infill drill results from the A3 high-grade domains continued, where the objective was to convert Inferred to Indicated Mineral Resources, where the Indicated Mineral Resources only will be incorporated into the Pre-Feasibility Study scheduled for Q3/2018 release.
- AR-18-202c1 intersected 40.0 m of total composite mineralization including 4.55 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within a 119.5 m section (477.5 to 597.0 m) in the A3 shear. The hole was designed as a 25 m infill hole in the A3 high-grade domain with an objective to convert Inferred to Indicated Mineral Resources.
- AR-18-186c2 intersected 55.0 m of total composite mineralization including 3.75 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within a 123.0 m section (393.0 to 516.0 m) in the A3 shear. The hole was designed as a 25 m infill hole in the A3 high-grade domain with an objective to convert Inferred to Indicated Mineral Resources.
- AR-18-197c3 intersected 40.0 m of total composite mineralization including 3.55 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within a 116.5 m section (595.0 to 711.5 m) in the A3 shear. The hole was designed as a 25 m infill hole in the A3 high-grade domain with an objective to convert Inferred to Indicated Mineral Resources.
Regional Exploration
South Arrow
Expansion drilling intersected mineralization including off-scale radioactivity which was 175 msouthwest of the main zone of mineralization at South Arrow. The target area remains prospective for future exploration and expansion.
- AR-18-199c1 intersected 9.5 m of total composite mineralization including 0.1 m of total composite off-scale radioactivity (>10,000 to 13,500 cps) within a 32.5 m section (345.5 to 378.0 m).
Patterson Conductor Corridor
Regional drilling on the Patterson Corridor focused on two high priority target areas, which included Mirror and the Arrow VTEM Conductor. The Mirror target area is located 1.5 km southeast of the Arrow Deposit along a parallel conductor. The drill holes in the area successfully intersected the targeted VTEM conductor but did not encounter significant uranium mineralization. The Arrow Conductor is situated approximately 2.5 km southwest and along strike from the Arrow Deposit, hosted within the same VTEM conductor. Arrow-type silicified semi-pelitic gneiss was intersected throughout in all of the 6 holes drilled in the area. Moderate to intense sericitic alteration, similar to Arrow-type alteration found proximal to the Arrow deposit was intersected in several of the drill holes.
Drill hole locations and long sections are shown in Figures 1 to 4. Drill hole descriptions can be found at www.nexgenenergy.ca
Development, Activities & Financial
- The Arrow Deposit remains open in most directions, with high potential for future high-grade discoveries in close proximity to existing mineral resources.
- Pre-feasibility staged technical studies including geotechnical work, hydrogeological work, and metallurgy continue in advance of the updated Mineral Resource Estimate and maiden Pre-Feasibility Study scheduled for the end of Q3 / early Q4 2018.
- The Company has cash on hand of approximately ~$150 million.
Troy Boisjoli, Vice-President, Operations and Project Development, commented: “The four winter 2018 drill program objectives were successfully reached. Two significant exploration initiatives resulted in the discovery of an A0 shear zone, and secondly testing 160 m northwest of the A0 shear has also intersected intense mineralization within another, yet to be defined zone which remains open. Additionally, expansion of Mineral Resources within the A1 and A2 shear zones from the AR-18-189 series holes demonstrate Arrow remains open on strike. The continued success of resource expansion and near Arrow exploration drilling, from my experience, indicates the absolute scale of the Arrow Deposit will not be fully realized without significantly more drilling and ultimately, not until underground. Furthermore, the infill drilling highlights the robustness of the Arrow Mineral Resource model and has maximized available Indicated Mineral Resources for the purpose of the maiden Pre-Feasibility Study. Regional exploration testing along strike from the Arrow Deposit successfully intersected prospective, Arrow-type alteration and lithological packages which highlights the potential for future discoveries along the Patterson Lake Corridor. The team is looking forward to testing the new A0 shear, northwest of the A0, northeast of the A1 and A2 and to the southwest of Arrow during summer 2018. ”
Leigh Curyer, Chief Executive Officer, commented: “The targeted winter drill campaign focused on converting Inferred to Indicated, expanding the overall footprint in previously untested areas and understanding future growth potential of Arrow. All of these were successfully achieved and with the discovery of the A0, intense mineralization 160m to the northwest of the A0, and to the northeast of the A1 and A2 shears, suggests substantial drilling is required to determine the ultimate extent of Arrow. Troy and his team are already in planning for a summer 2018 exploration and development program.”
Table 1: Arrow Drill Hole Data
Drill Hole |
Athabasca Depth (m) |
Handheld Scintillometer Results (RS-120) |
||||||
Hole ID |
Azimuth |
Dip |
Total |
From (m) |
To (m) |
Width |
CPS Range |
|
AR-18-186c1 |
330 |
-68 |
840.50 |
132.00 |
389.00 |
392.00 |
3.00 |
<500 – 33000 |
405.50 |
406.00 |
0.50 |
<500 – 1020 |
|||||
412.50 |
413.50 |
1.00 |
<500 – 8000 |
|||||
417.00 |
426.50 |
9.50 |
<500 – 9000 |
|||||
430.00 |
441.50 |
11.50 |
<500 – 61000 |
|||||
446.00 |
446.50 |
0.50 |
<500 – 850 |
|||||
454.00 |
462.50 |
8.50 |
<500 – 3800 |
|||||
467.50 |
469.00 |
1.50 |
<500 – 1480 |
|||||
507.50 |
514.50 |
7.00 |
<500 – 1450 |
|||||
531.00 |
552.50 |
21.50 |
<500 – 61000 |
|||||
582.50 |
583.00 |
0.50 |
<500 – 860 |
|||||
585.50 |
586.00 |
0.50 |
<500 – 600 |
|||||
590.00 |
597.50 |
7.50 |
<500 – 61000 |
|||||
666.00 |
666.50 |
0.50 |
<500 – 680 |
|||||
745.00 |
746.50 |
1.50 |
<500 – 1900 |
|||||
AR-18-186c2 |
330 |
-68 |
561.50 |
N/A |
393.00 |
394.50 |
1.50 |
<500 – 1700 |
406.00 |
407.00 |
1.00 |
<500 – 2300 |
|||||
411.00 |
411.50 |
0.50 |
<500 – 2740 |
|||||
432.00 |
435.50 |
3.50 |
<500 – 12000 |
|||||
442.50 |
445.00 |
2.50 |
<500 – 61000 |
|||||
448.00 |
452.50 |
4.50 |
<500 – 16000 |
|||||
455.50 |
476.00 |
20.50 |
<500 – 61000 |
|||||
479.50 |
482.50 |
3.00 |
<500 – 1720 |
|||||
487.50 |
488.00 |
0.50 |
<500 – 520 |
|||||
492.00 |
505.00 |
13.00 |
<500 – 4700 |
|||||
507.50 |
508.50 |
1.00 |
<500 – 2300 |
|||||
512.50 |
516.00 |
3.50 |
<500 – 1800 |
|||||
550.00 |
554.00 |
4.00 |
<500 – 1250 |
|||||
AR-18-187c1 |
327 |
-70 |
657.50 |
117.00 |
237.50 |
238.00 |
0.50 |
<500 – 9400 |
276.50 |
308.00 |
31.50 |
<500 – 5800 |
|||||
316.00 |
320.50 |
4.50 |
<500 – 2710 |
|||||
325.50 |
326.00 |
0.50 |
<500 – 505 |
|||||
333.00 |
333.50 |
0.50 |
830 – 2690 |
|||||
350.00 |
350.50 |
0.50 |
<500 – 1730 |
|||||
402.50 |
406.50 |
4.00 |
<500 – 850 |
|||||
421.00 |
423.50 |
2.50 |
<500 – 1500 |
|||||
437.00 |
444.00 |
7.00 |
<500 – 1490 |
|||||
478.50 |
481.50 |
3.00 |
<500 – 1100 |
|||||
521.00 |
523.50 |
2.50 |
<500 – 26000 |
|||||
AR-18-187c2 |
327 |
-70 |
930.50 |
N/A |
281.00 |
283.50 |
2.50 |
<500 – 930 |
301.50 |
328.50 |
27.00 |
<500 – 5230 |
|||||
331.00 |
331.50 |
0.50 |
750 – 1000 |
|||||
335.50 |
343.00 |
7.50 |
<500 – 1160 |
|||||
346.50 |
347.00 |
0.50 |
<500 – 710 |
|||||
356.50 |
357.00 |
0.50 |
<500 – 600 |
|||||
394.50 |
395.00 |
0.50 |
<500 – 900 |
|||||
398.50 |
399.00 |
0.50 |
<500 – 540 |
|||||
405.50 |
411.00 |
5.50 |
<500 – 1100 |
|||||
414.00 |
431.00 |
17.00 |
<500 – 61000 |
|||||
455.50 |
456.00 |
0.50 |
<500 – 520 |
|||||
487.00 |
495.00 |
8.00 |
<500 – 1270 |
|||||
892.50 |
893.50 |
1.00 |
<500 – 780 |
|||||
AR-18-187c3 |
327 |
-70 |
914.50 |
N/A |
280.50 |
282.00 |
1.50 |
<500 – 700 |
288.00 |
302.00 |
14.00 |
<500 – 6580 |
|||||
309.00 |
315.50 |
6.50 |
<500 – 3400 |
|||||
330.00 |
347.50 |
17.50 |
<500 – 3400 |
|||||
350.50 |
352.50 |
2.00 |
<500 – 1210 |
|||||
359.50 |
360.50 |
1.00 |
<500 – 720 |
|||||
408.50 |
413.00 |
4.50 |
<500 – 1200 |
|||||
426.00 |
428.50 |
2.50 |
<500 – 880 |
|||||
535.50 |
536.50 |
1.00 |
<500 – 690 |
|||||
547.00 |
548.50 |
1.50 |
<500 – 17000 |
|||||
552.50 |
557.00 |
4.50 |
<500 – 3590 |
|||||
559.50 |
560.50 |
1.00 |
<500 – 710 |
|||||
563.50 |
580.00 |
16.50 |
<500 – 2040 |
|||||
583.50 |
585.50 |
2.00 |
<500 – 1260 |
|||||
596.50 |
603.00 |
6.50 |
<500 – 9800 |
|||||
AR-18-187c4 |
327 |
-70 |
918.50 |
N/A |
283.00 |
330.50 |
47.50 |
<500 – 33000 |
339.50 |
340.00 |
0.50 |
<500 – 550 |
|||||
401.00 |
404.50 |
3.50 |
<500 – 3000 |
|||||
407.50 |
408.00 |
0.50 |
<500 – 720 |
|||||
412.50 |
417.00 |
4.50 |
<500 – 19500 |
|||||
419.50 |
427.00 |
7.50 |
<500 – 27000 |
|||||
448.50 |
453.00 |
4.50 |
<500 – 2800 |
|||||
460.00 |
460.50 |
0.50 |
<500 – 540 |
|||||
675.50 |
677.50 |
2.00 |
<500 – 1600 |
|||||
AR-18-188c1 |
327 |
-70 |
519.00 |
125.65 |
420.00 |
420.50 |
0.50 |
<500 – 630 |
432.00 |
432.50 |
0.50 |
<500 – 680 |
|||||
477.50 |
478.00 |
0.50 |
<500 – 550 |
|||||
483.50 |
489.00 |
5.50 |
<500 – 1800 |
|||||
AR-18-188c2 |
327 |
-70 |
582.00 |
N/A |
428.00 |
428.50 |
0.50 |
<500 – 620 |
432.50 |
434.00 |
1.50 |
<500 – 1050 |
|||||
486.50 |
487.00 |
0.50 |
<500 – 725 |
|||||
493.00 |
495.00 |
2.00 |
<500 – 15400 |
|||||
500.00 |
501.50 |
1.50 |
<500 – 40000 |
|||||
505.50 |
507.00 |
1.50 |
<500 – 61000 |
|||||
AR-18-188c3 |
327 |
-70 |
597.00 |
N/A |
440.00 |
440.50 |
0.50 |
<500 – 760 |
443.50 |
444.50 |
1.00 |
<500 – 760 |
|||||
495.50 |
496.00 |
0.50 |
<500 – 510 |
|||||
506.50 |
512.00 |
5.50 |
<500 – 2100 |
|||||
517.00 |
519.00 |
2.00 |
<500 – 9600 |
|||||
521.50 |
527.00 |
5.50 |
<500 – 7800 |
|||||
558.50 |
559.00 |
0.50 |
<500 – 560 |
|||||
AR-18-189c1 |
327 |
-70 |
984.50 |
128.00 |
704.00 |
705.00 |
1.00 |
<500 – 1100 |
855.00 |
859.00 |
4.00 |
<500 – 2258 |
|||||
867.00 |
871.00 |
4.00 |
<500 – 8200 |
|||||
884.50 |
885.50 |
1.00 |
<500 – 1400 |
|||||
AR-18-189c2 |
327 |
-70 |
1056.50 |
N/A |
No Anomalous Radioactivity |
|||
AR-18-189c3 |
327 |
-70 |
972.50 |
N/A |
828.50 |
836.50 |
8.00 |
<500 – 4700 |
843.50 |
848.00 |
4.50 |
<500 – 2200 |
|||||
850.50 |
855.00 |
4.50 |
<500 – 2400 |
|||||
862.50 |
873.00 |
10.50 |
<500 – 5600 |
|||||
879.50 |
885.00 |
5.50 |
<500 – 35000 |
|||||
AR-18-189c4 |
327 |
-70 |
930.50 |
N/A |
820.00 |
826.00 |
6.00 |
<500 – 61000 |
832.00 |
852.50 |
20.50 |
<500 – 61000 |
|||||
855.50 |
868.50 |
13.00 |
<500 – 18500 |
|||||
873.50 |
874.00 |
0.50 |
<500 – 600 |
|||||
AR-18-189c5 |
327 |
-70 |
915.50 |
N/A |
424.50 |
425.00 |
0.50 |
<500 – 1240 |
798.50 |
802.50 |
4.00 |
<500 – 24400 |
|||||
807.00 |
808.50 |
1.50 |
<500 – 2000 |
|||||
812.50 |
813.00 |
0.50 |
<500 – 840 |
|||||
816.50 |
819.50 |
3.00 |
<500 – 950 |
|||||
829.50 |
832.50 |
3.00 |
<500 – 8000 |
|||||
836.00 |
842.00 |
6.00 |
<500 – 6800 |
|||||
AR-18-195c1 |
327 |
-70 |
519.50 |
N/A |
395.50 |
396.00 |
0.50 |
<500 – 600 |
406.50 |
407.00 |
0.50 |
<500 – 1010 |
|||||
409.50 |
410.50 |
1.00 |
<500 – 3700 |
|||||
414.00 |
415.00 |
1.00 |
<500 – 39000 |
|||||
428.50 |
432.00 |
3.50 |
<500 – 61000 |
|||||
436.00 |
465.00 |
29.00 |
<500 – 61000 |
|||||
AR-18-195c2 |
327 |
-70 |
543.50 |
N/A |
405.00 |
406.00 |
1.00 |
<500 – 3000 |
409.00 |
409.50 |
0.50 |
<500 – 630 |
|||||
415.50 |
416.00 |
0.50 |
<500 – 20000 |
|||||
420.00 |
421.00 |
1.00 |
<500 – 4500 |
|||||
431.00 |
433.00 |
2.00 |
<500 – 61000 |
|||||
441.50 |
442.00 |
0.50 |
<500 – 4800 |
|||||
446.00 |
451.00 |
5.00 |
<500 – 22000 |
|||||
457.00 |
460.50 |
3.50 |
<500 – 33000 |
|||||
463.00 |
463.50 |
0.50 |
<500 – 1700 |
|||||
467.00 |
469.50 |
2.50 |
<500 – 16000 |
|||||
472.50 |
486.00 |
13.50 |
<500 – 61000 |
|||||
AR-18-195c3 |
327 |
-70 |
501.50 |
N/A |
387.00 |
395.50 |
8.50 |
<500 – 3200 |
398.00 |
405.00 |
7.00 |
<500 – 8000 |
|||||
430.00 |
433.00 |
3.00 |
<500 – 1060 |
|||||
436.00 |
437.00 |
1.00 |
<500 – 1100 |
|||||
AR-18-197c1 |
327 |
-70 |
630.50 |
N/A |
522.50 |
523.00 |
0.50 |
<500 – 580 |
563.00 |
564.50 |
1.50 |
<500 – 28000 |
|||||
575.50 |
576.50 |
1.00 |
<500 – 60000 |
|||||
582.00 |
582.50 |
0.50 |
<500 – 2050 |
|||||
587.00 |
591.50 |
4.50 |
<500 – 2550 |
|||||
595.50 |
596.50 |
1.00 |
<500 – 1300 |
|||||
606.50 |
608.50 |
2.00 |
<500 – 1400 |
|||||
612.50 |
618.50 |
6.00 |
<500 – 2200 |
|||||
623.00 |
627.00 |
4.00 |
<500 – 830 |
|||||
630.00 |
630.50 |
0.50 |
<500 – 1450 |
|||||
AR-18-197c2 |
327 |
-70 |
813.50 |
N/A |
585.00 |
585.50 |
0.50 |
500 – 20500 |
594.50 |
598.00 |
3.50 |
<500 – 5800 |
|||||
610.50 |
620.50 |
10.00 |
<500 – 61000 |
|||||
624.00 |
629.50 |
5.50 |
<500 – 2800 |
|||||
690.00 |
696.50 |
6.50 |
<500 – 2700 |
|||||
703.50 |
704.00 |
0.50 |
<500 – 700 |
|||||
719.00 |
719.50 |
0.50 |
<500 – 1150 |
|||||
753.00 |
753.50 |
0.50 |
<500 – 550 |
|||||
765.50 |
769.50 |
4.00 |
<500 – 13200 |
|||||
AR-18-197c3 |
327 |
-70 |
723.50 |
N/A |
549.00 |
549.50 |
0.50 |
<500 – 570 |
586.00 |
586.50 |
0.50 |
<500 – 7200 |
|||||
589.50 |
590.50 |
1.00 |
<500 – 5800 |
|||||
595.00 |
596.00 |
1.00 |
500 – 61000 |
|||||
620.00 |
621.00 |
1.00 |
<500 – 61000 |
|||||
630.50 |
631.00 |
0.50 |
<500 – 780 |
|||||
634.50 |
635.00 |
0.50 |
<500 – 3200 |
|||||
638.00 |
655.50 |
17.50 |
<500 – 61000 |
|||||
659.00 |
661.50 |
2.50 |
<500 – 7100 |
|||||
666.50 |
669.00 |
2.50 |
<500 – 2550 |
|||||
673.00 |
674.00 |
1.00 |
<500 – 1360 |
|||||
676.50 |
687.50 |
11.00 |
<500 – 1630 |
|||||
703.00 |
703.50 |
0.50 |
<500 – 1000 |
|||||
707.00 |
708.50 |
1.50 |
<500 – 1800 |
|||||
711.00 |
711.50 |
0.50 |
<500 – 530 |
|||||
AR-18-197c4 |
327 |
-70 |
858.50 |
N/A |
607.00 |
608.50 |
1.50 |
<500 – 61000 |
616.00 |
616.50 |
0.50 |
<500 – 7600 |
|||||
632.50 |
634.00 |
1.50 |
<500 – 61000 |
|||||
641.00 |
643.00 |
2.00 |
<500 – 11500 |
|||||
645.50 |
646.50 |
1.00 |
<500 – 8450 |
|||||
658.50 |
660.50 |
2.00 |
<500 – 1000 |
|||||
664.00 |
665.00 |
1.00 |
<500 – 1400 |
|||||
667.50 |
668.00 |
0.50 |
<500 – 790 |
|||||
674.50 |
688.50 |
14.00 |
<500 – 61000 |
|||||
697.50 |
698.00 |
0.50 |
<500 – 505 |
|||||
744.50 |
745.00 |
0.50 |
<500 – 590 |
|||||
759.00 |
760.00 |
1.00 |
<500 – 2100 |
|||||
784.50 |
786.50 |
2.00 |
<500 – 16600 |
|||||
789.50 |
790.50 |
1.00 |
<500 – 2600 |
|||||
827.00 |
832.00 |
5.00 |
<500 – 13000 |
|||||
835.50 |
838.00 |
2.50 |
<500 – 4100 |
|||||
AR-18-200c1 |
327 |
-70 |
885.50 |
121.20 |
489.50 |
492.50 |
3.00 |
<500 – 1900 |
530.50 |
531.50 |
1.00 |
<500 – 6200 |
|||||
536.00 |
537.00 |
1.00 |
<500 – 3600 |
|||||
606.50 |
607.00 |
0.50 |
<500 – 6500 |
|||||
627.50 |
629.00 |
1.50 |
<500 – 16000 |
|||||
634.50 |
635.00 |
0.50 |
<500 – 1600 |
|||||
645.50 |
646.00 |
0.50 |
<500 – 2000 |
|||||
651.00 |
651.50 |
0.50 |
<500 – 27000 |
|||||
659.00 |
671.00 |
12.00 |
<500 – 5000 |
|||||
674.00 |
689.50 |
15.50 |
<500 – 4700 |
|||||
705.50 |
710.50 |
5.00 |
<500 – 3250 |
|||||
714.00 |
716.00 |
2.00 |
<500 – 2950 |
|||||
728.50 |
729.00 |
0.50 |
<500 – 1290 |
|||||
737.50 |
740.50 |
3.00 |
<500 – 3200 |
|||||
745.50 |
759.50 |
14.00 |
<500 – 61000 |
|||||
763.50 |
774.00 |
10.50 |
<500 – 24000 |
|||||
AR-18-200c2 |
327 |
-70 |
900.00 |
N/A |
531.00 |
532.00 |
1.00 |
<500 – 1100 |
536.00 |
536.50 |
0.50 |
<500 – 810 |
|||||
644.50 |
647.50 |
3.00 |
<500 – 21000 |
|||||
653.00 |
653.50 |
0.50 |
<500 – 12800 |
|||||
672.50 |
692.00 |
19.50 |
<500 – 3200 |
|||||
702.00 |
703.50 |
1.50 |
<500 – 13000 |
|||||
721.50 |
736.50 |
15.00 |
<500 – 5360 |
|||||
739.00 |
769.50 |
30.50 |
<500 – 61000 |
|||||
772.00 |
774.00 |
2.00 |
<500 – 1010 |
|||||
779.00 |
782.00 |
3.00 |
<500 – 2300 |
|||||
835.00 |
835.50 |
0.50 |
<500 – 690 |
|||||
AR-18-200c3 |
327 |
-70 |
882.50 |
N/A |
618.50 |
619.00 |
0.50 |
<500 – 4400 |
645.00 |
645.50 |
0.50 |
<500 – 11000 |
|||||
648.50 |
649.00 |
0.50 |
<500 – 2250 |
|||||
653.00 |
653.50 |
0.50 |
<500 – 1100 |
|||||
664.00 |
664.50 |
0.50 |
<500 – 530 |
|||||
667.00 |
671.00 |
4.00 |
<500 – 4300 |
|||||
673.50 |
675.50 |
2.00 |
<500 – 1890 |
|||||
679.00 |
683.50 |
4.50 |
<500 – 15000 |
|||||
693.50 |
699.50 |
6.00 |
<500 – 2500 |
|||||
715.00 |
726.00 |
11.00 |
<500 – 1380 |
|||||
730.50 |
746.50 |
16.00 |
<500 – 2400 |
|||||
758.00 |
759.50 |
1.50 |
<500 – 61000 |
|||||
765.50 |
770.50 |
5.00 |
<500 – 7300 |
|||||
810.00 |
810.50 |
0.50 |
<500 – 650 |
|||||
AR-18-200c4 |
327 |
-70 |
870.50 |
N/A |
503.00 |
503.50 |
0.50 |
<500 – 940 |
514.50 |
515.00 |
0.50 |
<500 – 1210 |
|||||
521.50 |
522.00 |
0.50 |
<500 – 8750 |
|||||
611.50 |
616.50 |
5.00 |
<500 – 23000 |
|||||
628.50 |
631.50 |
3.00 |
<500 – 5600 |
|||||
634.50 |
639.00 |
4.50 |
<500 – 21000 |
|||||
644.00 |
644.50 |
0.50 |
<500 – 750 |
|||||
649.50 |
651.50 |
2.00 |
<500 – 2220 |
|||||
654.50 |
656.50 |
2.00 |
<500 – 2020 |
|||||
678.00 |
682.00 |
4.00 |
<500 – 3200 |
|||||
724.00 |
744.00 |
20.00 |
<500 – 54000 |
|||||
749.50 |
761.00 |
11.50 |
<500 – 60000 |
|||||
766.00 |
767.50 |
1.50 |
<500 – 3000 |
|||||
773.00 |
777.00 |
4.00 |
<500 – 7100 |
|||||
781.00 |
788.50 |
7.50 |
<500 – 4990 |
|||||
791.50 |
792.00 |
0.50 |
<500 – 820 |
|||||
796.00 |
799.00 |
3.00 |
<500 – 12100 |
|||||
AR-18-202c1 |
327 |
-70 |
600.50 |
N/A |
451.00 |
452.00 |
1.00 |
<500 – 1850 |
461.50 |
465.00 |
3.50 |
<500 – 7750 |
|||||
473.50 |
474.50 |
1.00 |
<500 – 720 |
|||||
477.50 |
483.00 |
5.50 |
<500 – 30000 |
|||||
485.50 |
486.50 |
1.00 |
<500 – 2100 |
|||||
495.50 |
509.50 |
14.00 |
<500 – 61000 |
|||||
512.00 |
523.50 |
11.50 |
<500 – 61000 |
|||||
528.00 |
529.00 |
1.00 |
<500 – 6000 |
|||||
532.00 |
536.00 |
4.00 |
<500 – 61000 |
|||||
541.00 |
541.50 |
0.50 |
<500 – 15000 |
|||||
550.00 |
550.50 |
0.50 |
<500 – 1100 |
|||||
565.00 |
566.50 |
1.50 |
<500 – 800 |
|||||
596.50 |
597.00 |
0.50 |
<500 – 550 |
|||||
AR-18-202c2 |
327 |
-70 |
621.50 |
N/A |
368.50 |
369.50 |
1.00 |
<500 – 1300 |
455.50 |
456.00 |
0.50 |
<500 – 620 |
|||||
461.50 |
468.00 |
6.50 |
<500 – 5600 |
|||||
478.50 |
479.50 |
1.00 |
<500 – 1200 |
|||||
483.50 |
484.50 |
1.00 |
<500 – 24000 |
|||||
494.50 |
495.00 |
0.50 |
<500 – 630 |
|||||
504.00 |
509.50 |
5.50 |
<500 – 16000 |
|||||
516.50 |
517.00 |
0.50 |
<500 – 2500 |
|||||
522.00 |
524.50 |
2.50 |
<500 – 39000 |
|||||
528.00 |
530.00 |
2.00 |
<500 – 32000 |
|||||
532.50 |
533.00 |
0.50 |
<500 – 740 |
|||||
543.50 |
544.50 |
1.00 |
<500 – 2800 |
|||||
549.00 |
552.00 |
3.00 |
<500 – 10800 |
|||||
571.50 |
576.50 |
5.00 |
<500 – 61000 |
|||||
580.00 |
581.00 |
1.00 |
<500 – 1700 |
|||||
593.50 |
595.00 |
1.50 |
<500 – 1300 |
|||||
604.50 |
616.50 |
12.00 |
<500 – 7800 |
|||||
AR-18-205c1 |
355 |
-70 |
571.00 |
103.15 |
No Anomalous Radioactivity |
|||
AR-18-206c1 |
327 |
-68 |
777.50 |
103.95 |
501.50 |
504.00 |
2.50 |
<500 – 1000 |
553.50 |
557.50 |
4.00 |
<500 – 14000 |
|||||
575.50 |
576.00 |
0.50 |
<500 – 1300 |
|||||
584.00 |
585.50 |
1.50 |
<500 – 16000 |
|||||
634.50 |
635.00 |
0.50 |
1000 – 61000 |
|||||
640.00 |
640.50 |
0.50 |
<500 – 600 |
|||||
649.00 |
657.50 |
8.50 |
<500 – 29000 |
|||||
671.50 |
676.50 |
5.00 |
<500 – 34000 |
|||||
681.00 |
690.00 |
9.00 |
<500 – 42000 |
|||||
694.50 |
695.00 |
0.50 |
<500 – 1750 |
|||||
697.50 |
700.00 |
2.50 |
<500 – 4900 |
|||||
712.50 |
717.50 |
5.00 |
<500 – 890 |
|||||
726.00 |
726.50 |
0.50 |
<500 – 2350 |
|||||
732.00 |
732.50 |
0.50 |
<500 – 1150 |
|||||
738.00 |
738.50 |
0.50 |
<500 – 530 |
|||||
742.00 |
745.50 |
3.50 |
<500 – 5300 |
|||||
751.00 |
751.50 |
0.50 |
<500 – 500 |
|||||
761.50 |
771.00 |
9.50 |
<500 – 5200 |
|||||
AR-18-207c1 |
327 |
-68 |
1083.50 |
123.40 |
573.00 |
575.50 |
2.50 |
<500 – 4000 |
580.50 |
581.00 |
0.50 |
<500 – 1900 |
|||||
712.00 |
712.50 |
0.50 |
<500 – 7500 |
|||||
AR-18-208c1 |
327 |
-68 |
802.70 |
108.15 |
198.50 |
199.00 |
0.50 |
<500 – 1050 |
562.00 |
562.50 |
0.50 |
<500 – 1350 |
|||||
598.00 |
598.50 |
0.50 |
<500 – 1170 |
|||||
637.50 |
638.00 |
0.50 |
<500 – 8900 |
|||||
662.00 |
662.50 |
0.50 |
<500 – 600 |
|||||
686.00 |
688.50 |
2.50 |
<500 – 32800 |
|||||
717.50 |
722.50 |
5.00 |
<500 – 1020 |
|||||
743.50 |
744.50 |
1.00 |
<500 – 660 |
|||||
AR-18-209c1 |
327 |
-68 |
762.50 |
115.60 |
500.50 |
507.00 |
6.50 |
<500 – 1730 |
709.00 |
709.50 |
0.50 |
<500 – 580 |
Parameters:
- Maximum internal dilution 2.00 m downhole
- All depths and intervals are metres downhole, true thicknesses are yet to be determined
- “Anomalous” means >500 cps (counts per second) total count gamma readings by gamma scintillometer type RS-120
- “Off-scale” means >10,000 cps (counts per second) total count gamma readings by gamma scintillometer type RS-120
- Where “Min cps” is <500 cps, this refers to local low radiometric zones within the overall radioactive interval
- Directional drilling has often resulted in mineralization intersected at a more favourable and shallower dip
Table 2: South Arrow Drill Hole Data
Drill Hole |
Athabasca |
Handheld Scintillometer Results (RS-120) |
||||||
Hole ID |
Azimuth |
Dip |
Total |
From (m) |
To (m) |
Width |
CPS Range |
|
AR-18-190c1 |
315 |
-68 |
348.00 |
N/A |
No Anomalous Radioactivity |
|||
AR-18-191c1 |
315 |
-70 |
375.00 |
N/A |
No Anomalous Radioactivity |
|||
AR-18-192c1 |
315 |
-68 |
429.00 |
N/A |
300.50 |
301.00 |
0.50 |
<500 – 550 |
304.00 |
305.00 |
1.00 |
<500 – 970 |
|||||
AR-18-193c1 |
315 |
-70 |
657.50 |
N/A |
No Anomalous Radioactivity |
|||
AR-18-194c1 |
315 |
-68 |
555.50 |
N/A |
356.50 |
357.00 |
0.50 |
<500 – 2800 |
375.50 |
376.00 |
0.50 |
<500 – 505 |
|||||
457.50 |
458.00 |
0.50 |
<500 – 570 |
|||||
470.00 |
470.50 |
0.50 |
<500 – 550 |
|||||
478.00 |
479.00 |
1.00 |
<500 – 850 |
|||||
AR-18-196c1 |
315 |
-67 |
615.50 |
N/A |
No Anomalous Radioactivity |
|||
AR-18-198c1 |
315 |
-68 |
543.00 |
N/A |
338.50 |
339.50 |
1.00 |
<500 – 1200 |
367.50 |
368.00 |
0.50 |
<500 – 600 |
|||||
456.00 |
458.00 |
2.00 |
<500 – 2200 |
|||||
460.50 |
465.00 |
4.50 |
<500 – 3300 |
|||||
468.50 |
469.00 |
0.50 |
<500 – 505 |
|||||
AR-18-199c1 |
315 |
-68 |
567.00 |
N/A |
345.50 |
347.50 |
2.00 |
<500 – 850 |
350.50 |
351.00 |
0.50 |
<500 – 620 |
|||||
359.50 |
360.00 |
0.50 |
<500 – 580 |
|||||
374.50 |
378.00 |
3.50 |
<500 – 13500 |
|||||
AR-18-199c2 |
315 |
-68 |
486.00 |
N/A |
402.00 |
402.50 |
0.50 |
<500 – 700 |
AR-18-201c1 |
315 |
-66 |
444.00 |
N/A |
252.00 |
252.50 |
0.50 |
<500 – 630 |
AR-18-203c1 |
315 |
-66 |
510.50 |
N/A |
253.50 |
254.00 |
0.50 |
<500 – 790 |
AR-18-204c1 |
315 |
-66 |
524.00 |
N/A |
No Anomalous Radioactivity |
Parameters:
- Maximum internal dilution 2.00 m downhole
- All depths and intervals are metres downhole, true thicknesses are yet to be determined
- “Anomalous” means >500 cps (counts per second) total count gamma readings by gamma scintillometer type RS-120
- “Off-scale” means >10,000 cps (counts per second) total count gamma readings by gamma scintillometer type RS-120
- Where “Min cps” is <500 cps, this refers to local low radiometric zones within the overall radioactive interval
- Directional drilling has often resulted in mineralization intersected at a more favourable and shallower dip
Table 3: Regional Exploration Hole Data
Drill Hole |
Athabasca Basement Depth (m) |
Handheld Scintillometer Results (RS-120) |
||||||
Hole ID |
Azimuth |
Dip |
Total |
From (m) |
To (m) |
Width (m) |
CPS Range |
|
RK-18-120 |
140 |
-70 |
615.50 |
N/A |
No Anomalous Radioactivity |
|||
RK-18-121 |
340 |
-70 |
609.00 |
N/A |
No Anomalous Radioactivity |
|||
RK-18-122 |
320 |
-70 |
651.50 |
N/A |
No Anomalous Radioactivity |
|||
RK-18-123 |
340 |
-70 |
561.50 |
N/A |
No Anomalous Radioactivity |
|||
RK-18-124 |
340 |
-67 |
504.50 |
N/A |
No Anomalous Radioactivity |
|||
*RK-18-125 |
320 |
-66 |
496.00 |
N/A |
290.00 |
291.50 |
1.50 |
<500 – 4300 |
321.00 |
323.00 |
2.00 |
<500 – 2700 |
|||||
RK-18-126 |
327 |
-66 |
532.50 |
N/A |
No Anomalous Radioactivity |
|||
RK-18-127 |
345 |
-66 |
423.50 |
N/A |
No Anomalous Radioactivity |
|||
RK-18-128 |
320 |
-66 |
407.00 |
N/A |
No Anomalous Radioactivity |
|||
RK-18-129 |
325 |
-66 |
399.00 |
N/A |
No Anomalous Radioactivity |
Parameters:
- Maximum internal dilution 2.00 m downhole
- All depths and intervals are metres downhole, true thicknesses are yet to be determined
- “Anomalous” means >500 cps (counts per second) total count gamma readings by gamma scintillometer type RS-120
- “Off-scale” means >10,000 cps (counts per second) total count gamma readings by gamma scintillometer type RS-120
- Where “Min cps” is <500 cps, this refers to local low radiometric zones within the overall radioactive interval
- Directional drilling has often resulted in mineralization intersected at a more favourable and shallower dip
- *Mineralization listed in RK-18-125 was determined via a RS-125 Spectrometer to be of a Thorium source.
About NexGen
NexGen is a British Columbia corporation with a focus on the acquisition, exploration and development of Canadian uranium projects. NexGen has a highly experienced team of uranium industry professionals with a successful track record in the discovery of uranium deposits and in developing projects through discovery to production.
NexGen owns a portfolio of prospective uranium exploration assets in the Athabasca Basin, Saskatchewan, Canada, including a 100% interest in Rook I, location of the Arrow Deposit in February 2014, the Bow discovery in March 2015, the Harpoon discovery in August 2016 and the Arrow South discovery in July 2017. The Arrow deposit’s updated mineral resource estimate with an effective date of December 20, 2016 was released in March 2017, and comprised 179.5 M lbs U3O8 contained in 1.18 Mtonnes grading 6.88% U3O8 in the Indicated Mineral Resource category and an additional 122.1 M lbs U3O8 contained in 4.25 M tonnes grading 1.30% U3O8 in the Inferred Mineral Resource category.
Source: NexGen Energy Ltd.